OUR MISSIONS
We are specialist consultants providing world-class Signaling, Telecommunications, and independent RAMS engineering services to the global rail industry.
In the rail industry, performance and safety are non-negotiable. Railcon MMC Consulting is a dedicated team of elite engineers who bridge the gap between complex technical design and stringent safety standards. We de-risk your most critical projects by delivering pragmatic, expert consultancy.
Signaling Systems
· From ALSN, Interlocking, KLUP, VEPS, ERTMS/ETCS and CBTC to traditional interlockings, we provide design review, independent verification & validation (IV&V), and project engineering support to ensure flawless operation.
Railway Telecommunications
· Expert consultancy for GSM-R, FRMCS,LTE, TETRA, DMR, networks, passenger information, public address, telephony, ,intercom, access control, clock and fire alarm systems. We ensure your communication backbone is robust, secure, and future-proof.
RAMS & Safety Assurance
· Full lifecycle RAMS management. We develop Safety Cases, manage Hazard Logs, and perform FMEA/SIL verification
Implementation Period
Project Commencement: July 07, 2023
Commercial Operation Date (COD): August 30, 2025
Defect Liability Period (DLP) Commencement: July 1, 2026
Site Characteristics
Signaling System
Section length: 79 km
Number of stations: 4
Number of points: 35
Number of signals: 77
Semi-automatic block sections: 4
Axle counting detectors: 131
Coding points: 44
Guarded level crossings: 9
Unguarded level crossings: 7
Telecommunication Systems
Data transmission system:
L3 Switch/Routers: 4 units
L2 Switches: 40 units
Network Management System (NMS): 1 license
IP telephony system:
Call processing server: 1 unit
Media application server: 1 unit
IP telephones: 70 units
Digital radio system (DMR Tier III):
Radio server: 1 unit
Base stations: 7 units
Towers (25 m): 7 units
Portable radio stations: 60 units
Power Supply System
4 Power Supply Systems for Station
9 Power Supply Systems for Level Crossing
Implementation Period
Project Commencement: August17, 2023
Commercial Operation Date (COD): August 29, 2025
Defect Liability Period (DLP) Commencement: July 1, 2026
Site Characteristics
Total line length: 116 km
Number of stations: 6
Total number of points: 125
Number of signals: 292
Automatic block sections: 7
Axle counting detectors: 432
Guarded level crossings: 18
Unguarded level crossings: 1
10 Power Supply Systems for Station and Technical Building
18 Power Supply Systems for Level Crossing
Hot Box Detector System
Total HBD units: 10 (including 4 newly installed units)
Contacts
controller@railcon-az.net